5.5 hours / week
Spent looking for project information.
That was the average reported in a 2018 PlanGrid/FMI survey of 599 construction leaders. The information included revised drawings and material cut sheets.
PlanGrid + FMI · 2018 studyCONSTRUCTION DOCUMENT INTELLIGENCE
Upload your drawings, specifications and addenda. Field Authority connects the documents so you can ask project questions, get AI answers with sources you can check, and identify discrepancies that need your team’s review.
7-day trial · Card required · $79/month after trial
Field Authority builds a project map from your drawings, specifications and addenda, connecting related information so you can ask across the document set and check the sources behind each answer.
The sample drawings show continuous footings, a 6-inch interior slab, a pump pad and exterior flatwork. Addendum 01 increases the service apron to 8 inches; the sidewalk stays 4 inches. Confirm the pump-pad dimensions where structural and mechanical drawings disagree.
Sample sources: S-101 · Structural; C-201 · Civil; M-601 · Mechanical; Addendum 01, Item 2Built for the questions that come up before the bid and on the job.
WHY BETTER ACCESS TO INFORMATION MATTERS
Time spent finding the right information is time you cannot spend estimating, coordinating or moving the work forward.
5.5 hours / week
That was the average reported in a 2018 PlanGrid/FMI survey of 599 construction leaders. The information included revised drawings and material cut sheets.
PlanGrid + FMI · 2018 study14%
A 2021 Autodesk/FMI study estimated this share of construction rework in 2020. Its survey covered more than 3,900 industry professionals.
Autodesk + FMI · 2021 studyHistorical, vendor-sponsored industry research. These findings describe the industry problem; they do not measure Field Authority’s results.
Field Authority brings the documents and their cited requirements into one place to ask, review and verify.
SEE WHAT A CONNECTED REVIEW CAN REVEAL.
A detail can look right on one sheet and conflict with another. Field Authority connects the requirements and shows the sources behind the answer.
Illustrative example with fictional drawing references and excerpts. No live project review is performed.
SAMPLE ANSWER
One discrepancy identified: conflicting pump-pad dimensions. The structural drawing shows a 30 × 48-inch pad, but the mechanical schedule requires 36 × 54 inches for the same pump. The structural pad is 6 inches smaller in both directions.
Foundation plan · Equipment pad notes
“Provide a 30 × 48-inch concrete pad for Pump P-1.”
Equipment schedule · Pump P-1
“Required concrete support pad: 36 × 54 inches. Coordinate the support pad and anchor layout with the approved equipment submittal before concrete placement.”
Confirm the intended pad dimensions and anchor layout with the design team and approved pump submittal. Field Authority identifies the document conflict; the project team determines the resolution and whether work can proceed.
FROM YOUR DOCUMENTS TO YOUR NEXT DECISION
Keep the drawings, specifications and addenda for a job together in one private workspace.
Field Authority processes the uploaded files and builds the project context for your questions.
Ask about scope, quantities, requirements or coordination. Follow the cited sources and review any gaps before acting.
ANSWERS YOU CAN CHECK
A useful answer should help you move forward—and make it easy to check the details that matter.
Understand the relevant scope, materials and requirements without piecing the explanation together yourself.
Follow references to the files, sheets and sections behind the answer.
See where instructions conflict or information is missing so you know what to verify with the project team.
A WORKSPACE OF YOUR OWN
INDIVIDUAL
For document processing and project reviews. Your balance stays visible, and additional usage is available when you need it.
One subscription is for one person and cannot be shared. Additional Project Intelligence usage can be purchased when needed.
BEFORE YOU START
Upload construction drawings as PDF files. Specifications, addenda and other project documents can be uploaded as PDF or TXT files, then reviewed together inside the same project.
Units are the monthly allowance used for document processing and AI-powered project reviews—not API tokens. Questions start at 125 units; document processing and other reviews also use units. Your balance remains visible in your account. Processing pauses at usage or safety limits, and extra usage is purchased explicitly—there are no automatic usage charges.
Field Authority identifies the controlling and supporting sources it found, surfaces conflicts and labels anything the project documents do not establish. It does not present a guess as a verified requirement.
The seven-day trial includes one active project and 1,000 Project Intelligence units. A card is required, and you can cancel during the trial to avoid the first $79 monthly charge.
Your project workspace is tied to your verified account. The Individual subscription is for one named user and is not a shared login.
Public access begins October 1. Already have an account?