Field AuthorityAI PROJECT INTELLIGENCE

CONSTRUCTION DOCUMENT INTELLIGENCE

Less searching.
More clarity.

Upload your drawings, specifications and addenda. Field Authority connects the documents so you can ask project questions, get AI answers with sources you can check, and identify discrepancies that need your team’s review.

7-day trial · Card required · $79/month after trial

YOUR PROJECT, CONNECTED
DRAWINGSSPECIFICATIONSADDENDA
Your documents. One connected project.

Field Authority builds a project map from your drawings, specifications and addenda, connecting related information so you can ask across the document set and check the sources behind each answer.

SAMPLE PROJECT QUESTION

What concrete work is required across this project?

The sample drawings show continuous footings, a 6-inch interior slab, a pump pad and exterior flatwork. Addendum 01 increases the service apron to 8 inches; the sidewalk stays 4 inches. Confirm the pump-pad dimensions where structural and mechanical drawings disagree.

Sample sources: S-101 · Structural; C-201 · Civil; M-601 · Mechanical; Addendum 01, Item 2
Illustrative questions, answers and references for a fictional project.

Built for the questions that come up before the bid and on the job.

ESTIMATORSSUPERINTENDENTSPROJECT MANAGERSOWNERS & FIELD TEAMS

WHY BETTER ACCESS TO INFORMATION MATTERS

The document hunt
has a real cost.

Time spent finding the right information is time you cannot spend estimating, coordinating or moving the work forward.

5.5 hours / week

Spent looking for project information.

That was the average reported in a 2018 PlanGrid/FMI survey of 599 construction leaders. The information included revised drawings and material cut sheets.

PlanGrid + FMI · 2018 study

14%

Of global rework linked to decisions using poor data.

A 2021 Autodesk/FMI study estimated this share of construction rework in 2020. Its survey covered more than 3,900 industry professionals.

Autodesk + FMI · 2021 study

Historical, vendor-sponsored industry research. These findings describe the industry problem; they do not measure Field Authority’s results.

Field Authority brings the documents and their cited requirements into one place to ask, review and verify.

SEE WHAT A CONNECTED REVIEW CAN REVEAL.

Two drawings.
One costly mismatch.

A detail can look right on one sheet and conflict with another. Field Authority connects the requirements and shows the sources behind the answer.

Illustrative example with fictional drawing references and excerpts. No live project review is performed.

FIELD AUTHORITYSAMPLE REVIEW
YOUR QUESTION

What discrepancies can you find across the project drawings?

SAMPLE ANSWER

One discrepancy identified: conflicting pump-pad dimensions. The structural drawing shows a 30 × 48-inch pad, but the mechanical schedule requires 36 × 54 inches for the same pump. The structural pad is 6 inches smaller in both directions.

S-101 · Structural

30 × 48 inches

Foundation plan · Equipment pad notes

“Provide a 30 × 48-inch concrete pad for Pump P-1.”
M-601 · Mechanical

36 × 54 inches

Equipment schedule · Pump P-1

“Required concrete support pad: 36 × 54 inches. Coordinate the support pad and anchor layout with the approved equipment submittal before concrete placement.”
For project-team review

Confirm the intended pad dimensions and anchor layout with the design team and approved pump submittal. Field Authority identifies the document conflict; the project team determines the resolution and whether work can proceed.

FROM YOUR DOCUMENTS TO YOUR NEXT DECISION

Your documents in.
Your questions answered.

01

Add your project documents

Keep the drawings, specifications and addenda for a job together in one private workspace.

02

Let Field Authority review the set

Field Authority processes the uploaded files and builds the project context for your questions.

03

Ask. Check. Decide.

Ask about scope, quantities, requirements or coordination. Follow the cited sources and review any gaps before acting.

ANSWERS YOU CAN CHECK

See what is required.
Know where it came from.

A useful answer should help you move forward—and make it easy to check the details that matter.

01

The requirement

Understand the relevant scope, materials and requirements without piecing the explanation together yourself.

02

The evidence

Follow references to the files, sheets and sections behind the answer.

03

What needs clarification

See where instructions conflict or information is missing so you know what to verify with the project team.

A WORKSPACE OF YOUR OWN

One workspace.
One straightforward price.

Available October 1 with a seven-day free trial.

One subscription is for one person and cannot be shared. Additional Project Intelligence usage can be purchased when needed.

BEFORE YOU START

A few things to know
before you start.

What files can I upload?

Upload construction drawings as PDF files. Specifications, addenda and other project documents can be uploaded as PDF or TXT files, then reviewed together inside the same project.

What are Project Intelligence units?

Units are the monthly allowance used for document processing and AI-powered project reviews—not API tokens. Questions start at 125 units; document processing and other reviews also use units. Your balance remains visible in your account. Processing pauses at usage or safety limits, and extra usage is purchased explicitly—there are no automatic usage charges.

What happens when the documents disagree or leave something out?

Field Authority identifies the controlling and supporting sources it found, surfaces conflicts and labels anything the project documents do not establish. It does not present a guess as a verified requirement.

What is included in the free trial?

The seven-day trial includes one active project and 1,000 Project Intelligence units. A card is required, and you can cancel during the trial to avoid the first $79 monthly charge.

Are my projects private?

Your project workspace is tied to your verified account. The Individual subscription is for one named user and is not a shared login.

Start with a real project.
Ask what matters to you.

Public access begins October 1. Already have an account?

Sign in to Field Authority